Design. Build.One coordinated vision.
A clear route from site understanding to coordinated design and, ultimately, a carefully delivered building.
01 · Before Design
Site Visit & Feasibility Study
An informed project begins on the ground. We assess the site, access, context, opportunities and constraints before the design direction is established.
41–90 km
KES 19,500
USD 15091–200 km
KES 26,000
USD 200200–500 km
KES 39,000
USD 300Important
Rates apply per professional individual, per visit.
01One professional — the listed rate.
02Two professionals — twice the listed rate.
03Architect + Engineer + Q.S — three times the listed rate.
02 · Coordinated Design
Professional Design Services
Architectural Services
- Site analysis and concept development
- Space planning and floor plans
- Building sections and elevations
- 3D visualisations and renders
- Approval and construction drawings
- Door, window and finishes schedules
Structural Engineering
- Structural scheme and load analysis
- Foundation layouts and details
- Column and beam layouts
- Slab and staircase design
- Reinforcement detailing
- Structural calculations and coordination
M.E.P Engineering
- Electrical, power and lighting layouts
- Data, security and communication layouts
- Water-supply and plumbing systems
- Drainage and sanitation design
- Ventilation and air-conditioning
- Fire protection and coordinated drawings
Quantity Surveying
- Preliminary cost estimates
- Cost planning and project budgeting
- Bills of Quantities
- Tender documentation
- Contractor quotation analysis
- Valuations, variations and final accounts
Professional design fees are calculated as a percentage of the project's construction cost. The Architectural Services + B.O.Q fee is a combined 2%; Quantity Surveying is not charged as an additional percentage in this package.
03 · From Drawings to Site
Build Services
- 01
Pre-Construction & Mobilisation
Planning, procurement and site establishment
2–5%indicative share- Construction planning and coordination
- Contractor procurement and site possession
- Temporary facilities, utilities and access
- 02
Site Preparation & Substructure
Earthworks, foundations and below-ground services
10–18%indicative share- Site clearance, setting out and excavation
- Foundations and ground-floor structure
- Drainage and underground service provisions
- 03
Superstructure
Primary frame, floors, walls and stairs
20–30%indicative share- Structural frame and upper-floor construction
- Columns, beams, slabs and staircases
- Masonry, partitions and structural coordination
- 04
Roof & Building Envelope
Weatherproofing, façade and external openings
8–15%indicative share- Roof structure, covering and waterproofing
- External wall finishes and façade systems
- Windows, external doors, glazing and insulation
- 05
M.E.P Installations
Mechanical, electrical and plumbing systems
12–20%indicative share- Electrical, lighting and communication systems
- Water supply, plumbing and drainage installations
- Ventilation, fire protection and specialist systems
- 06
Interior Finishes & Joinery
Surfaces, fittings and completed internal spaces
15–25%indicative share- Wall, floor and ceiling finishes
- Doors, cabinetry and specialist joinery
- Sanitary fittings, fixtures and final decoration
- 07
External Works & Landscaping
Access, services and the completed site environment
5–12%indicative share- Driveways, parking, paths and boundary works
- External drainage, utilities and site lighting
- Soft landscaping and outdoor amenities
- 08
Testing, Commissioning & Handover
Verification, completion and client occupation
1–3%indicative share- Testing and commissioning of building systems
- Snagging, rectification and final inspections
- As-built records, warranties and client handover
Project-specific costing
These ranges indicate where construction costs commonly concentrate; they are not fixed quotations and should not be added together. Building type, scale, structural system, site conditions, location, material specification and level of finishes all affect the final distribution. The project B.O.Q converts the approved design into a detailed allocation totalling 100% of the construction cost.
Construction timeframes are issued only after the project scope, approvals, procurement route and site conditions are confirmed. Statutory charges and professional fees are stated separately unless a project-specific proposal expressly includes them.